Tip the hooked end of the bracket under the front flange and press the remaining end over the back fo the gutter.
How to install gutter from higher to lower roof.
Below the shingles on the high side of the gutter run.
When installing gutters set the proper slope by driving a nail 1 2 in.
The guttering should run a few inches lower than your roofline.
You don t need more than 1 4 inch drop towards the downspout for every 10 feet legnth of gutter.
For every 10 feet of gutter from this measurement and mark this distance at the low end of the gutter run.
On some homes a gutter can look like a rainbow high in the center and low on both ends of the house where the downspout outlet and downspouts are located.
How to install gutters.
In almost every instance gutter installers take the path of least resistance and shove the gutter right underneath the roof shingles instead.
With help lift the gutter in place and secure the corner first screwing the bracket into the roof s fascia.
Measure and record the distance from the bottom of the fascia board to this nail.
Clip the lip and slide the backside under the gutter.
Gutters should be hung where a straight edge laying on your roof shingles can easily extend over the front lip of the gutter this is the proper installment location for the high point of the gutter.
5 tips every homeowner should know.
Starting at one end of the gutter clip the screen lip to the front of the gutter then slide the backside under the shingles.
Mount the gutter so that the edge without the downspout is slightly higher than the end with the sleeve.
Gutters that are too high can enable runoff water to drip down their back side which in turn can cause deteriorating fascia boards and stains on siding.
Continue down the length of the gutter in the same manner.
Attach the gutter strip to the fascia or roof edge with nails and gutter straps.