Board and batten can be installed onto solid plywood or osb sheathing.
How to install hardie board and batten siding.
With a helper expect to spend a day installing 800 square feet of siding.
Hardie board installation will require joints between planks.
Since the primer or stain acts as a preservative it gives your board and batten added toughness that will keep them from deteriorating quickly.
Traditionally board and batten siding starts with wide vertical planks boards which are then joined together by thin vertical strips battens to cover the seams.
In addition to applying stain to both sides and all edges nailing both boards and battens correctly also is key.
Nebraska state capitol building rise into view.
Before you begin cover the sheathing with building wrap and install trim boards and flashings.
Join factory edges and place the cut edges against the corner trim boards.
Here there are you can see one of our how to install hardie board and batten siding gallery there are many picture that you can surf we think you must click them too.
Priming or staining prior to installing your hardie board and batten is a must since this process keeps their quality from being compromised.
Caulking joints are unnecessary but flashing behind the joints is required.
Prime or stain all surfaces of the board and batten.
Cut a piece of 6 inch wide steel coil trim about 1 inch longer than the width of a siding board and place it behind the joint.
Rdesigns suggests the traditional method.
Be sure to go to the 14th flooring statement deck for a nice view of lincoln and the surrounding countryside.
After a morning.