As a homeowner you will work with a contractor who will facilitate the installation of your james hardie siding trim soffit wrap and flashing products including products with colorplus technology.
How to install hardie shake siding.
Install a 16 inch panel on the.
Blind nail your hardie siding in place.
Join factory edges and place the cut edges against the corner trim boards.
Hardie board installation will require joints between planks.
Measure and cut 32 inches off the first piece of the third row saving the cut pieces to use on the other end of the.
Caulking joints are unnecessary but flashing behind the joints is required.
Butt the cut end into trim as shown figs 22 24.
And canada who are available to work with any contractor or builder.
How to install hardie siding step 1.
1 install a 1 1 4 in starter strip then install a 8 1 4 in wide hardieplank lap siding starter course.
Install a 32 inch panel on the second row using the cut end to abut the trim.
2 place first panel so that panel end centers over stud.
Trim panel as needed.
Begin at the lowest point at the side of your house where you will install your hardie siding.
We have dozens of installation specialists throughout the u s.
Apply a 1 1 4 inch starter strip right above the water table trim located at the bottom edge of the house wall.