4 deep nail the drip edge to the sheathing every 16 if installing multiple runs of drip edge lap them by 1 4 1 2 inch keeping the nail back from the lapped joint.
How to install roof drip edge video.
If it doesn t pull the drip edge out slightly from under the shingles.
The leading edge of the flashing is called the drip edge.
Flat roof installation drip edge pvc clad metal installation.
In this video paulricalde shows the two main types of roof drip edge flashing how to cut both inside and outside corners on them and how to retrofit drip edge on a simple roof.
Walkthrough of the basic cut for drip edge installation on your roofing project.
Roofing solutions by eric garcia.
Replacing an old flat roof diy instructional video a must watch.
The outside square cut is the basis for all other cuts.
Install the starter course.
Turns out not all drip edge flashing perform the same.
Some drip edge flashings actually help houses turn.
Apply a continuous bead of cement along.
Using drip edge with a nailing edge approx.
Slip the wide flat flange of the material all the way under the first course of roof shingles as illustrated.
The roof leg should extend a minimum of 2 back onto the roof sheathing.
Secure the drip edge with roofing cement.
This will allow for expansion and contraction and prevent buckling.
While the vertical leg should be placed 1 4 1 2 away from the fascia.
Make sure the outer edge extends over the gutter.
The starter course is comprised.
How to install a drip edge.
To install a drip edge on a newly constructed roof or on a re roofing job attach the drip edge along the roof s eaves first.