10 panel wood screw space according to the recommended fastening pattern and local codes.
How to lay a pro panel roofing.
6 transition trim place trim over outside closure.
Take care the first piece is aligned precisely perpendicular square to the edge.
Add the metal panels.
Contact building regulators to determine the requirements for.
For this example it s exactly 24 inches and i m going to add an inch and a half to that measurement and cut my panel to length.
The roof panels will not withstand the weight of a person standing at the edge of the panel.
9 roofing panel install with lower edge 1 above the transition bend.
At this point chalk a line from ridge to eave.
Do not stand on the roof panel until the panels have been attached.
Align the first metal roofing panel so that it overlaps the edging by 1 2 to 3 4 of an inch and is square to the roof.
Take measurements from the roof peak to the eave for custom cut premium pro snap panels.
Place the leading edge of the first panel along this line.
Install the roofing screws vertically along each rib in the panel.
It is extremely important that this panel be laid square to the eave and ridge so that the remaining panels will line up square on the roof frame.
The application and detail drawings in this manual are strictly for illustration purposes and may not be appli.
This guide is supplied by fabral inc.
Measure one panel width in from the roof edge.
This guide must by read in its entirety before beginning installation.
5 rib roofing panels must be applied on a minimum roof pitch of 2 12 or greater.
Place the first screw.
To do so flip the panel over and make marks on the reverse side.
Use a scaffold for easy access to the roof.
For use by its customers and is intended to be a guide only.
Be sure the larger edge is laid so that the small edge of the next panel will overlap it.
How to install premium pro snap roofing step 1.
Fasten using panel wood screws.
Put your tape up against the end wall and measure down to the edge of your eave trim.
To watch the entire series from the beginning click here.
This does not replace local or state building codes.
Take your first sheet of metal and place it on the roof so that it overhangs the edge at least 3 4 in 1 9 cm.
Pro panel ii install guide.