Starting at the bottom of the roof map out a guideline with chalk.
How to lay a wooden shingle roof.
Spend some time selecting the best face of the shingles and then nail a double starter course.
Separate shingles approximately 6mm apart.
Secure it to the.
This will be the first row of your roof and is crucial to the rest of your build.
Measure out with the use of the chalk line and tape measure a few inches of overhang.
Known in the trade as vertical racking or staggering this how to lay shingles method enables the roofer to install a single column of shingles all the way to the peak without the wasted back and forth motion necessary to fill several rows of stair steps.
Nail metal flashing called drip edge along the bottom edge of the roof deck near the gutters.
Many pros shingle in a vertical line up the roof because it s much faster.
It is best to use timber roofing battens and counter battens with a membrane to allow adequate air flow if necessary.
Step 8 the complete shingle roof.
Lay the first row of shingles directly covering the narrow starter row.
Check with the manufacturer of your wood shingles to know the exact measurement.
Then with a nail gun nail in each wood shingle piece by piece for the first row.
Use a hammer stapler to fasten it down applying a staple every 12 to 14 inches.
Cover the roof with roofing felt.
How to install a cedar shingle roof on a garden shed.
Position the first shingle so its end overhangs the edge of the roof by 1 1 4 to 1 1 2 inches.
Continue to chalk additional guidelines based on the width of the shingle through at least four courses rows across.
Snap a horizontal chalk line over the starting row to use as a guide.
Use your chalk and tape measure to mark about 12 inches up on the roof for the first set of shingles.
Ask this old house general contractor tom silva reveals the best ways to secure shingles to a roof.