Now you re ready to begin installation of the starter strips and corner posts that receive the siding panels.
How to measure vinyl siding corner post.
Special trim is available to cover the outer edge of vinyl siding on an outside corner and for siding to meet at an inside corner for a finished look.
How to prepare walls for vinyl or aluminum siding.
Is that how it s supposed to be much like with 2x lumber that s 5in short.
To have enough siding for your dormers measure your dormers height and multiply by width.
Install starter strips trim.
Gap at the top where the post will meet the eaves.
Check the width of the trim or fascia along the eves of the home.
Hold the corner post up a bit and run the j channel beneath it instead.
Cut the post long enough to extend past the bottom of the starter strip by 3 4 in.
There are several other materials needed for a vinyl siding project.
If your home does not have a wrap installed you ll want to order enough to cover the building.
Vinyl corner post sizes i ordered what was supposed to be 5 corner posts but instead got those that were 4 wide on each side of the corner.
Height times width and then multiply by 0 75 to account for the angle.
Corner posts above the roofline are a notorious source of water infiltration.
H x w x 0 75 number of squares to cover your gables.
Position the outside corner post to allow 1 4 in.
Then multiply by 1 5 and you ll have enough siding to cover the two sides of the dormer.
Measure the height of each outside corner and add together to find the amount of outside corner trim needed and repeat this process for the inside corners.
This article is a continuation of the discussion that began with step 1.
If a corner post is installed tight to the shingles and the j channel dead ends into it any water that runs down the j channel will back up at the post and may find its way into the house.
How to install vinyl and aluminum siding and step 2.
Repair upgrade your vinyl siding corners and add curb appeal and market value to your home.