Smartside siding instructions wall preparation.
How to nail lp smart siding.
Using a nail gun makes quick work of installing lp smartside products.
How to install lp siding starting with the trim.
3 16 gap at butt joints between horizontal sections and where the siding meets doors windows and corner trim.
The manufacturer requires proper fastening of the product to the home.
See diagrams 6e and 6f fastener length.
Sensitive to moisture smartside siding requires proper wall preparation to protect it from moisture.
Do not overdrive nails.
The nails should be long enough to penetrate the structural framing by at least one and one half inches.
In this instructional video we demonstrate how to install lp smartside lap siding using h molding which gives a more professional look with equal functiona.
Once you have installed the majority of the trim you re ready to begin installing the siding.
Long enough to fully penetrate structural.
Never nail from the ends of the siding toward the middle.
38 series cedar shake.
Nail head should seat firmly to face of siding but not be overdriven to distort the.
Do not attempt to edge nail without pre drilling.
Because siding is considered a cladding material it is necessary to have a weather or vapor.
Shim siding at studs as needed to avoid drawing siding against uneven walls.
Contractors watch this video to learn about the advantages of using lp smartside trim siding products and how to install them.
You want to use a minimum of 113 inch shank diameter hot dipped galvanized box style nail with a minimum of 270 inch head diameter.
See diagram 3c for edge nailing all nail holes must be pre drilled.
Apply nails to meet the specifications in the general application equipment section in this document.
Lp smartside strand substrate cedar shake.
To fasten the.