Apply asphalt saturated felt as underlayment over the entire deck.
How to onstall astm slate surfacing roll roofing.
Hammer the nails in at 10 inches 25 cm intervals across the roof.
Of underlayment with roll roofing.
Application place 9 side strips of roll roofing along the eaves and rakes positioning them to.
191 m 36.
Application place 9 side strips of roll roofing along the eaves and rakes positioning them to.
Ensure that you hammer the nails properly into the roof don t leave the nails sticking up above the layer.
Apply horizontally parallel to eaves lapping each course of the felt over lower course at least 2 and where ends join lap the felt 4.
Apply horizontally parallel to eaves lapping each course of the felt over lower course at least 2 and where ends join lap the felt 4.
Install edge cant strips around the roof.
Install roll roofing directly over clean dry plywood minimum 15 32 11 9 mm decking or approved equal on slopes equal to or greater than 1 12 for the concealed nail method or 2 12 for.
Make sure you use a strong hammer and 1 inch 2 5 cm roofing nails.
Features and benefits versatile and easy to handle.
Since this is the least difficult of roofing materials to install only basic carpentry skills are needed.
Fiberglass mineral surfaced roll roofing fiberglass mineral surfaced roll roofing is a glass fiber reinforced asphalt coated product with a ceramic granular surface to protect against uv weathering and physical damage.
It is lightly coated with a mineral release material on the bottom side.
Here is what a typical manufacturer of roll roofing expects to find below an installation of their mineral granule surfaced residential roll roofing product.
Install valley flashings and any other sidewall flashings that must extend underneath the finish roof covering.
This cap sheet slate surface roll roofing product is made of a stable inorganic felt coated on both sides with asphalt sebs and surfaced on the weather side with mineral granules.
Prepare the roof by tearing off the old shingles or by preparing for a reroof.
Measure the roof and calculate the materials and supplies needed.
Working with a helper expect to spend half a day installing flashings and roll roofing for a 700 square foot roof with modest complications.
Of underlayment with roll roofing.
914 mm 36 length.
Hammer nails into the rolled roofing to secure it.