Installing solar panels doesn t happen overnight there s a process for what needs to happen to get your panels ready to begin powering your home.
How to prepare your new construction for installing solar panels.
The ideal roof for a residential solar system has 500 sq ft 46 m 2 of unobstructed south facing unshaded space sloped at a 30 degree pitch.
While most of your solar panel system is on the roof there are some components that need to be installed near your electrical panel.
Overall the project was a fun experience and the total amount of money that i spent was around 400 500 which includes the battery charge controller and deep cycle battery.
If you have the option of pre installing the wiring for your solar power system during the build it will make life much easier for your solar installer saving them time and saving you money.
So i saved a large portion by building my own solar system since a commercial solar panel would have cost 400 on up for just the solar panel itself.
2 check the orientation size pitch and shading of your roof.
It s much quicker to run electrical wiring before your walls have been gyprocked.
Installing solar panels may require a building permit where you live.
Space near the main electrical panel for pv inverters and other equipment.
Overall from the day you sign your contract with your installer it will typically take between one and three months before your solar panels are grid connected and producing energy for your.
Pre wiring and pre laying your solar panels.
Preparing your roof for solar panels means removing every possible barrier to the installation.
In order to prepare your property for solar panel installation you ll need to consult with a building inspector to ensure your roof is structurally sound and capable of housing heavy solar arrays.
If there isn t enough room you likely will not get the return you expect on your investment.
Due to the weight and surface area utilized when installing solar arrays on a residential rooftop it s important to first check the condition of your roofing materials before committing to a solar solution.
The homeowner or a certified professional must get onto the roof for a thorough inspection and then.