What are some helpful james hardie lap siding installation tips.
How to properly install hardiplank siding.
Learn how to install hardiepanel vertical siding products.
Apply a 1 1 4 inch starter strip right above the water table trim located at the bottom edge of the house wall.
Measure down from the top of the installed board 1 1 4 inches every four feet and make a mark.
Hardie plank siding is almost always installed with air nailers which are the best tool for quick installation.
Installation instructions may vary depending on the manufacturer and check with your local building inspector for any code requirements.
This video will outline the basics of installing james hardie s fiber cement products.
Fiber cement is tougher than other materials hold the starter 1 4 in.
Optionally install the lap siding with a maximum 1 8 gap and caulk the joint see detail at right.
To get the longevity you deserve out of your james hardie siding it needs precise installation.
Blind nail your hardie siding in place.
Installing fiber cement siding fcs such as hardieplank is easier than you might think though there are some important differences from traditional wood siding.
When taking planks from the pallet for installation avoid repeating the texture pattern by working your way across.
Nail the board to the house every 16 to 24 inches with a roofing nail along the nail line printed on the top of the siding board.
How to install hardie siding step 1.
How to cut nail and install durable fiber siding plus caulking and painting tips.
Install hardiplank siding with joints butted in moderate contact.
Poor siding performance can be the result of improper installation.
Down preassemble the corners install fiber cement using a few special techniques layout the siding courses remove the plastic last flash the butt.
Hold a hardieplank siding board with the top edge against the chalk line and 1 8 inch away from the corner trim.
The only downside of pneumatic tools is that sometimes the installer will get going a little bit too quickly and will lose track of where the nails are going.
For accurate fastening snap vertical chalk lines on the water resistive barrier at the center of every stud location.
The first course of any wall should be installed over a 1 4 lath strip to ensure a consistent plank angle see figure 1.