Start from the top of the roof and remove the old shingles along with the flashing underlayment and vents.
How to put down roofing shingles.
Inspect the underlying roof sheathing for damage and make any needed repairs.
Hammer down any large nails that are exposed by the removal.
Ask this old house general contractor tom silva reveals the best ways to secure shingles to a roof.
Pull the drip edge down about a half inch from that line to create a gap between the drip edge and the fascia board.
See below for a shopping list tools and steps subscr.
Starting at the bottom of the roof map out a guideline with chalk.
Lay the next row of shingles directly on top of the first row making the row two tiles thick.
Remove air vents and pipe flashings by prying out or unscrewing the fasteners holding the fixture.
Continue to chalk additional guidelines based on the width of the shingle through at least four courses rows across.
Using the chalk line snap a line between the two marks to get a straight edge.
You ll get the most life out of your shingles and your roof by laying them in a smart.
Doing it now will make it easier to keep the reroofing job clean.
Use a flat pry bar.
Nail metal flashing called drip edge along the bottom edge of the roof deck near the gutters.
Nail down the shingles as you go along.
Use your chalk and tape measure to mark about 12 inches up on the roof for the first set of shingles.
Remove the ridge caps.
If a shingle is.
Place a whole shingle next to it.
When laying the shingles for the top row cut 6 inches 15 2 centimeters from the first shingle in the left corner of the roof using the utility knife.
Use sticky back ice and water shield as underlayment where ice dams or leaf and twig dams are likely to build up and at.
How to do it remove caps.
Stagger each course to achieve the half pattern.
Using alternate patterns 1.
Many pros shingle in a vertical line up the roof because it s much faster.
Known in the trade as vertical racking or staggering this how to lay shingles method enables the roofer to install a single column of shingles all the way to the peak without the wasted back and forth motion necessary to fill several rows of stair steps.
Consider four and five.
All the other patterns work in essentially the same way offsetting.