Make sure the rolled roofing is parallel to the eve of the roof.
How to put up rolled roofing.
Before you start to fix it you must check its integrity.
Use 1 nails for re roofing.
How to do it attach first course.
Make sure the roofing material is laying flat with no bumps or wrinkles attach the upper edge with the large head.
Plan so that no two butt joints are closer than 2 feet from each other.
Step 6nail the first course match the overhang to the overhang of the starter strip 1 4 to 3 8 from the drip edge.
Valleys will be open so flash them before hand with metal or two layers of roll roofing the first an 18 inch wide strip and the second 36 inches wide.
Snap a chalk line as a guide for the first layer roofing.
Position the first course so it overhangs the drip edges by about 1 4 inch and roll it out a.
Do not use the eaves as a guide instead because they can be uneven.
Fix edge fabric roll.
Install roll roofing measure 35 inches up from the eaves at several intervals along the roof and mark them.
How to apply roll roofing laying begins at the lowest point.
To seal a plumbing vent spread roofing.
The roll is unwound and laid on the site of the future installation.