Continue to chalk additional guidelines based on the width of the shingle through at least four courses rows across.
How to put up roofing shingles.
Shingling a shed and want some tips.
First snap a line for the top of the.
If possible have the shingles delivered via a boom directly onto the roof.
Adhere the shingles adjacent to the flange with roofing tar.
Cut the shingles to fit around the flange s dome.
Many pros shingle in a vertical line up the roof because it s much faster.
Overlap each metal piece by at least 150 mm 6 and use asphalt plastic cement under each section of overlap.
Watch and see how easy it is.
Lay the lower edge of the flange over the top of the lower shingles and the upper edge is positioned underneath the.
To start installing shingles line up aluminum drip edge flush with the edge of the roof and make a pencil line at the top on each end of the house.
Use your chalk and tape measure to mark about 12 inches up on the roof for the first set of shingles.
Adhere the joint where the cut edges of the shingles meet the dome.
Snap horizontal chalklines to help you keep the courses straight.
Known in the trade as vertical racking or staggering this how to lay shingles method enables the roofer to install a single column of shingles all the way to the peak without the wasted back and forth motion necessary to fill several rows of stair steps.
Lay the next row of shingles directly on top of the first row making the row two tiles thick.
Center a minimum 610 mm 24 wide minimum 28 gauge pre finished galvanized metal valley liner in the valley and fasten with only enough nails to hold it in place nailing at the edges only.
Install a starter strip.
Handy home shows you universal shingling techniques that can be applied to any shed.
How to do it prep work space.
Using the chalk line snap a line between the two marks to get a straight edge.
Nail down the shingles as you go along.
Starting at the bottom of the roof map out a guideline with chalk.