Use a 4 inch 10 cm paintbrush or a roller to apply the paint or primer.
How to re felt and batten a roof.
Eventually i was in a position to lay felt and batten out the roofs.
To replace a small section of roofing felt involves stripping the tiles from the roof and replacing felt between two joists.
This is not required for dry fix systems.
If a batten end is to be set in mortar be sure an appropriate treatment has been applied.
Start at the lower edge of the roof nailing the batten into place at the centre of the rafter.
A slight sag between rafters is ideal as it will allow any water to drain down the felt.
This would be a big step to being properly waterproof.
This will cost around 460 510 made up of.
Joints should be directly over rafters with the batten square cut tightly butted and skewed nails.
I had been using tarpaulins over the trusses but they can only do so good a job and when the wind blows the damn things rustle like mad the rain then finds its own lovely little route to somewhere you don t want it.
Begin at the bottom working in horizontal lines and gradually moving upward.
Drag it gently from one end of the roof to the other east to west or west to east.
When the first length is complete lay the next layer of felt on top of the first so that it overlaps by at least 100mm 4 inches horizontal overlaps where one roll ends and the next one is started should be at least 150mm 6 inches.