In severe climate regions most building codes require applying it 3 to 6 ft.
How to re roof my workshops.
Don t assume you re covered because the roof was recently installed.
Lay a strip of felt at the bottom of the roof and move towards the top of the roof with each new strip.
However you don t have to feel overwhelmed or alone.
Often the financial aspects of installing a new roof or repairing your existing roof are so overwhelming that a healthy roof may seem like an impossible goal.
Ask for the name of the manufacturer notify the company of the change in ownership and find out if the warranty transfers to you.
Use a staple gun or hammer tacker to staple the felt to the roof.
Nail down loose roof sheathing to rafters.
Ensure that each higher strip slightly overlaps the strip below it.
Sturdy and waterproof materials are the best for use on a shed roof or garden building.
Cover roof deck with 30 pound felt underlayment.
Which material can i use for my shed roof.
Here at roofing superstore we d recommend using felt bitumen roof sheets bitumen shingles plastic lightweight roof tiles or wood shingles to secure an attractive long term waterproof roof.
Using double roman roof tiles.
Up from the eave minimum of 2 ft.
Staple felt every 6 to 8 inches.
15 asphalt saturated felt underlayment some codes may require no.
Cover the rest of the roof with no.
Past the exterior wall.
Workshops yards watch this old house ask this old house.
Nail drip edge flashing to lower edge of roof.
Call your building inspector for local details.
Trim tabs off roof shingles to create starter course.
This is just the basics on how to re roof a main roof.
There are many government grants for roof replacement that could help keep your home sturdy and snug.
Snap vertical chalk line down center of roof.
Pry off old roof shingles with pitch fork.