Step 2 find leaks.
How to replace a corrugated iron roof.
Step 4 conduct regular inspections.
Divide the square footage of your roof by 18 to give you the number of sheets you ll need.
How to repair a leaking corrugated roof.
Step 1 cut the panels to the desired length.
In comparison to an ordinary roof covered with asphalt shingles a corrugated metal roof can last up to three times as long as asphalt or 25 to 60 years.
Wear hearing and eye protection.
If it is an extendable type make sure that extensions are secured.
Enjoy the videos and music you love upload original content and share it all with friends family and the world on youtube.
A corrugated metal roof is incredibly cost effective durable and sturdy and has long been the preferred material for roofing for agricultural and industrial buildings.
Circular saw 2 x research source slower than angle grinder but follow same step 2 pre drill holes on the ridges.
Most panels come up to 32 feet 9 8 m in length.
Here i show you how easy it is to re roof a shed with onduline roofing.
Angle grinder 1 x research source the fastest option.
Step 1 gain access.
Some panels have pre drilled holes.
Paint or prime cut edges to prevent rust.
Corrugated metal roofing generally comes in sheets that are 3x6 feet in size 18 square feet.
Hammer down any large nails that are exposed by the removal.
When i built my garden shed in 1987 i used onduline corrugated roofing following the.
Inspect the underlying roof sheathing for damage and make any needed repairs.
Remove old roofing and repair any damage start from the top of the roof and remove the old shingles along with the flashing underlayment and vents.
Wearing a harness.
Multiply those numbers and then double the result for the square footage of your roof.
Measure the length of the roof and the breadth of one side.
Allow for a minimum of 18 inches 46 cm if you need to lap to complete the run.