Step 2 strip your old roof.
How to roof a house yourself.
10 steps to roofing a house 1.
Step 4 install water guard.
Slope is calculated as rise over run.
Many building codes regulate the number of layers of shingles that.
Figure out the slope of the roof by setting a carpenter s level on the underside of one rafter in the attic.
Arrange the shingles so the ends and the tab notches do not lie directly above gaps in the shingle below.
If the gaps lined up water could get directly onto the roof sheathing and then seep in through a nail hole.
In this video this old house general contractor tom silva explains how to reshingle a roof.
Size up your roof to find out how many shingles tarpaper and other materials you need.
First measure the length and width of one section of the roof then measure the distance the roof rises from the lowest point to the highest point.
Nail down loose roof sheathing to rafters.
Study your structure and take.
A house attached patio roof takes advantage of the house s structure by supporting one end of the roof on a ledger mounted horizontally to the house.
Choose an appropriate kind of.
Install shingles from the lower left corner working to the right and also working up the roof slope.
If you need more than one flashing in.
Learn your local building codes regarding roofs.
Measure the length width and rise of one section your roof.
Roll on the felt paper.
Install self stick underlayment under the metal flashing.
The ledger typically a 2 by 6 is usually designed to hold one end of the patio roof rafters.
Pry off old roof shingles with pitch fork.
Step 1 plan your job.
Cover underlayment with tar.
The ledger should be attached before the foundation is built for a deck patio roof posts and other structure.
Step 5 install.
Staple felt every 6 to 8 inches.
Cover the roof above the underlayment with roofing felt paper.
To start each course drive a.
Roofing a house in 7 steps.
Step 3 replace or re nail your sheathing.
If not you can always use your.
Before you can begin to update your roof you will have to get an accurate measurement and order your materials.
Cover roof deck with 30 pound felt underlayment.
Remove the old roof.
Check with your local government agency regarding the need for a building permit before.
Locating and mounting the ledger is normally a fairly easy process.
How to roof a house cover the roof with felt paper.
Use measuring tools to find the length and width of the roof from the ground outside.
At this point you should have a completely debris free roof.