Add ceiling joists every 24 in 61 cm on your top plates.
How to shingle a cross gable roof.
Tips on how to install shingles on a straight gable roof starter course.
The starter course is the first row of shingles that you ll install along the eaves of the roof.
Tying in to an existing gable roof tie into the end of an existing gable roof by removing existing facing boards wall siding and any other obstructions back to the first truss of the old roof.
Framing the gable ends 1.
Nail 2 boards onto your walls as top plates.
Known in the trade as vertical racking or staggering this how to lay shingles method enables the roofer to install a single column of shingles all the way to the peak without the wasted back and forth motion necessary to fill several rows of stair steps.
Set the first shingle of the second row back a half tab 6 inches 17 centimeters from the edge of first shingle on the first row and so that the bottom of its tabs just touches the tops of the cutout slots on the shingle below.
This 1 2 tab has to be cut off where it hangs off the left edge of the gable roof.
Make sure you keep this first row straight using the ice and water shield as a guide.
Butt the first new truss against the old one.
When installing the paper you will overlap the felt paper per local building code usually 2 4.
Center a minimum 610 mm 24 wide minimum 28 gauge pre finished galvanized metal valley liner in the valley and fasten with only enough nails to hold it in place nailing at the edges only.
Offsetting each successive course horizontally by 6 inches from the course below it will make the.
In this video i show you how i do the valleys on a shingle roof.
Then mount new trusses on the new addition walls.
Lay the second row of shingles.
Repeat steps for gabled ends installing the drip edge up the roof along the gable.
No one of this affirmat.
Determine the pitch you want for.
Overlap each metal piece by at least 150 mm 6 and use asphalt plastic cement under each section of overlap.
Start at the eave area just over the ice and water shield with a three inches of overlap about 3 and work your way up.
Many pros shingle in a vertical line up the roof because it s much faster.
To lay out the design for the shingles begin at the bottom of the roof and place a tape measure inch from the edge of the roof to ensure the shingles.
Many roofers cut the shingles across because they say it s safer.