How to shingle a hip roof.
How to shingle a dutch hip roof.
In this article builder larry haun explains how the framing is laid out cut and installed.
To make the shingle flush they would cut a short slice parallel with the ridge.
Sep 17 2014 a dutch roof has elements of both a gable roof and a hip roof.
Place the first shingle on the roof so that the bottom of it is even with the edge at the bottom.
That s how the guys.
Attach to the rafters with nails.
The gable at the top is part of the roof or can be a stand alone fixture in the middle of the roof which provides attic space or extra windows.
Advantages of a dutch hip roof.
Dutch hip roof style.
Bending and overlapping these flaps the guys would put two more nails to anchor it in place.
Dutch hip roof style is a combination of the traditional hip and the gable roof styles.
The guys would cut a second shingle to overlap the back half of the first one.
Finish by affixing the shingles to the plywood.
You might be amazed to know that dutch hip roof is having four sides.
The hip shingles continued all the way to the ridge and that last shingle was cut to length so as to avoid covering the open ridge rafter.
Place the 4 6 common rafters in their designated positions along the 2 longest walls and nail them firmly to the wall with a nail gun.
Use roofing nails for this job.
Other than this these are very solid and practically designed.
The first step in the process of erecting the hip roof is to get the ridge beam into place at the top of the roof.
Make sure you re wearing a pair of heavy work gloves and then trim the sides of the shingle with a utility knife so it matches the angle of the ridge it is against.
Attach 4 6 centering rafters and lift the ridge beam into place.
The gable is the triangular portion which is placed on the peak of the hip roof.
Following are some of the main advantages and disadvantages of this type of roof design.
I am roofing a building with 36 wide 5 rib roofing.
This will help to keep the weather out of the gable roof.
After both hips were finished the guys would place a shingle along the ridge.
Line up the first shingle with the bottom of the entire shingle lined up with the bottom edge of the roof.
This means it is very much suitable for removal of rain water and snow.
Put plywood on the rafters along with waterproofing materials.