Nail every 12 inches on center.
How to start siding above brick.
For vertical siding install j channel trim.
Hold the strip against.
Then nail a 3 1 2 in.
At the bottoms of windows install under sill trim for horizontal siding and j channel trim for vertical siding.
Install trim under eaves rakes.
You ll want to install a strip at every panel joint.
It is imperative that the furring strips are straight.
Mark on your brick wall where you need to attach each vertical furring strip.
Insert fasteners masonry screws or nails through the furring strips and into the guide holes.
Attach the strips to the wall.
If the transition exceeds 10 feet in.
Use a tape measure to measure the distance between each needed mark.
Attach a 2 by 2 inch wood furring strip to the walls centered on each of the chalk marks.
Mark the length of the brick wall with chalk every 24 inches.
How to install hardiplank over brick.
Siding over brick exterior.
Measure and mark the flashing to length with the measuring tape and a felt tip marker.
For horizontal siding install f channel trim at the soffit and gable rake.
Wear work gloves and cut.
Step 3 install insulation caulking and siding panels.
If the top is mitered miter the sides as well.
How it s done step 1.
Spend the extra few bucks on the wider stuff and start your siding a bit lower.
On the wall you ll need to mark the location you need for each.
Click here to learn some vinyl siding cleaning techniques that will make your house look new.
How to transition from brick to siding.
Plywood above this line to hold out the bottom of the first row of siding and nail the starter strip to this plywood.
Most suppliers sell two sizes of starter 2 1 2 in.
Use your drill and masonry bit to drill guide holes along your drawn vertical lines through furring strips and into the brick.
Mark the locations for your furring strips.