In this video i show you how i do the valleys on a shingle roof.
How to tie roll roofing into a shingle roof.
The flashing should double lap the roll roofing.
Armourvalley or other materials like epdm pvc or tpo covering.
Even though the higher roof was installed first the end result.
Instead the roof must be done with a modified bituminous membrane e g.
The most trusted miami roofing contractor professionally describes the installation of thi.
Place the first layer of rolled roofing on the roof.
String the line along the top of the frame until it meets the shingle roof.
If the deck you are tying into is 10 squares there s no reason to replace the whole thing when you can get by with one square.
As you place the rolled roofing down stretch it to get rid of wrinkles and creasing.
Everything should lap just like shingles.
Carefully remove the shingles 2 3 feet out from where your valley will be tying in.
As with applying shingles to any roof invert the bottom row of shingles for your starter row.
Dbower for a roof that new tinner pretty much summed it up.
The first layer should cover the roof as far as the chalk line.
No one of this affirmat.
At this point your will have a starter row at the bottom and a row of shingles along each side.
Run a line of shingles from the top butt it against the bottom row of shingles on your home and lay them along each edge with the tabs facing inward.
This video shows the transition of a shingle roof to a metal roof.
It has a slope of 2 3.
Hold the end of a chalk line at one of the outermost top corners of the carport roof frame.
It appears to be flat but it needs a slope to allow the water to drain from the roof.
Roofing nails to the existing structural sheathing.
The big idea is that layers of the lower roof should sit below corresponding layers of the upper roof.
Push the rolled roofing down into the wet cement to secure it to the roof.
Mark this point of the.