Pull the rubber from the shipping box and drag it across the roof.
How to install termination bar with epdm roofing.
Apply termination tape to the wall just below the line.
Metal edge termination epdm detail.
Ensure that the rubber membrane extends a minimum of 25mm on to the.
Find out how to join an epdm rubber membrane to an existing roofing material such as felt using a termination bar.
Position termination bar on.
Installing z bar flashing on tpo termination bar.
A termination bar must be cut at inside and outside corners.
Prior to installation of the termination bar pull back the topside of the membrane flashing 20 mm and apply a bead of water block between the membrane and the wall.
For more information please visit http.
This is how to install epdm roofing correctly.
Apply termination tape to connect the wall and roof tapes so the entire rubber perimeter is sealed.
How to install a termination bar video and installation guide fold back epdm and apply water cut off mastic.
The bar is 25mm x 3m and has pre punched holes every 150mm on center.
With a pencil or chalk line mark the desired rubber perimeter on the wall and roof edges.
Start with the edge facing the wall and work towards the roof s edge.
Fold back the rubber membrane over the surface to be joined to.
If using water based adhesive the technique involves spreading adhesive onto the roof using a paint roller in sections of three or four feet across the leading edge.
Install the termination bar with an acceptable hammer plug system at 200 mm o c.
The termination bar is an extruded aluminum bar that s designed for securing and sealing compression type flashing terminations when the water cut off mastic is inserted behind the epdm membrane and lap sealant is applied along the top of the termination bar.